A B2B cost structure for rooms, support facilities, utilities, logistics, installation and project evidence
Price the Camp as a System, Not a Single Room
A modular worker accommodation cost depends on more than sleeping modules. A functioning camp can include supervisor rooms, bathrooms, kitchens, dining, laundry, offices, first-aid space, recreation, security, storage, utilities, roads, drainage, fire systems and future expansion. A low unit price may leave the buyer with a large unpriced site scope.
Xutuo House describes container houses as possible temporary accommodation, office or warehouse facilities for engineering settings. Its public projects page does not provide a verified named worker-camp delivery with unit counts, dates or performance outcomes. Buyers should request project-specific evidence and references where needed rather than treating a general application statement as a completed case.
Eight Cost Packages
- Accommodation modules: room types, occupancy, furniture, storage and accessibility.
- Sanitary facilities: toilet and shower ratios, hot water, laundry and cleaning provisions.
- Support buildings: kitchen, dining, recreation, offices, clinic, security and stores.
- Envelope and climate package: project-specific insulation, openings, HVAC, corrosion and moisture controls.
- Utilities: generation or incoming power, distribution, water, wastewater, communications and metering.
- Factory documents and inspection: drawings, schedules, records, hold points and batch release.
- Logistics: packing, ocean or land transport, customs, storage, crane and internal site movement.
- Site and lifecycle: foundations, installation, testing, maintenance, spare parts, relocation and demobilization.
Issue a Camp Schedule with the RFQ
- Peak and average workforce with shift pattern
- Room mix and bed count by block
- Bathroom, kitchen, dining, laundry and support-space capacities
- Site country, climate, hazards and project standards
- Concept layout and expansion phases
- Utility source, loads and connection boundaries
- Delivery route, crane and installation responsibilities
- Required documents, inspections, spares and handover records
Separate Budget, Tender and Final Order Figures
An early budget can use assumptions, but they must be written. A tender quotation should respond to a defined schedule and list deviations. The final order price should refer to approved drawings and scope. Do not compare a budget shell price with a fully serviced camp price or convert a single-unit price into a project total without considering shared facilities and infrastructure.
Commercial Risks to Make Visible
- Exchange rate and freight validity
- Batch size and production sequence
- Change and rework rules
- Inspection access and rejection procedure
- Taxes, duties and destination fees
- Weather or site-delay responsibilities
- Spare-parts and warranty process
- Demobilization or relocation scope
Frequently Asked Questions
Can cost be quoted per bed?
A per-bed figure can support comparison only when room standards, support facilities, utility scope, logistics and site work are consistent.
Does Xutuo publish a completed worker-camp case?
The reviewed projects page presents engineering accommodation as an application but does not provide a verified named case with project metrics.
Use Whole-Life Questions in Supplier Evaluation
A project expected to operate for several seasons should evaluate cleaning, corrosion inspection, seal replacement, HVAC service, plumbing access, spare parts and the ability to repair damaged finishes. If modules may be relocated, ask for inspection and recommissioning steps after transport. These requirements can affect the initial specification and the quantity of spares shipped with the first batch.
Define who receives defect reports, expected response information and how replacement items are identified. Do not publish a warranty duration unless it appears in the signed order. A practical support process is more useful than a broad after-sales promise with no model, location or response scope.
Send a Quote-Ready Inquiry to Xutuo House
Submit a facility schedule and site data so the supplier can price the whole accommodation system rather than a generic room.
Review the relevant Xutuo project-application page and send the country, intended use, quantity, destination, target date and required configuration to Xutuo House for a project-specific response.
Sources and Verification Scope
Source boundary: Xutuo product facts below are manufacturer-published information, not independent certification. Local permitting, engineering and utility requirements must be verified for the project location.