Treat the Purchase as a Building Project and a Freight Project
Buying a prefab ADU from China to the USA creates two linked control systems. The building must be defined for the destination, and the cargo must move through export packing, ocean freight, customs, inland transport, unloading and storage without losing documents or damaging components. Problems arise when the house quotation and logistics plan are developed separately.
1. Define the Destination Requirement Before Production
Provide the city and state, intended occupancy, site plan, local design inputs, utility conditions and the evidence requested by the authority or project professionals. Do not wait until the unit is complete to ask whether drawings, calculations, labels, inspections or material records are needed.
2. Freeze the Commercial and Technical Scope
- Model and drawing revision
- Room and opening dimensions
- Kitchen, bathroom and finish schedules
- Electrical voltage, frequency, loads and connection boundary
- Plumbing and HVAC scope
- Documents and inspection records
- Incoterm, named place, destination and exclusions
- Change-control and approval process
3. Approve the Shipping Data
Require a package schedule with dimensions, gross weights, package numbers and contents. Match it to the loading drawing, commercial invoice and packing list. Confirm whether loose items travel inside the module, in separate crates or in another container. The forwarder should review door clearance, payload, route, terminal handling and final-mile restrictions.
4. Allocate Customs and Destination Responsibilities
Identify the importer of record and the parties responsible for classification, declarations, duties, fees, examinations, demurrage, storage and inland movement. Use a qualified customs broker and freight professional for the actual shipment. Rates and requirements can change, so do not rely on an old example as a current landed-cost calculation.
5. Prepare the Site Before Arrival
- Foundation and anchoring ready to the approved design
- Road access and turning route checked
- Crane position, radius and capacity verified
- Temporary storage and weather protection arranged
- Utility connection points located and isolated
- Licensed trades and inspection sequence booked
- Damage-report, inventory and punch-list forms ready
6. Installation and Handover
Inspect the cargo before unloading, photograph any damage, reconcile package marks and follow the approved lifting and installation instructions. Complete anchoring, joints and weather seals before connecting systems. Qualified local parties should make and test the required electrical and plumbing connections. Closeout should include as-built records, test results, manuals, spare parts and unresolved-item tracking.
Frequently Asked Questions
Does the factory price include US duties and site work?
Only if the quotation explicitly says so. Confirm the Incoterm, named place and every inclusion or exclusion.
Can shipment be booked from the folded dimensions online?
No. Use final packed dimensions, gross weights and an approved loading plan.
| Logistics boundary: verify current customs, carrier and port requirements with qualified parties for the actual route; this article is a procurement checklist, not a tariff ruling. |
Plan for Exceptions, Not Only the Ideal Route
The logistics plan should identify who responds if the vessel schedule changes, the container is selected for examination, free time expires, inland access is blocked, a package is damaged or the crane cannot work on the planned day. Record contact points, authorization limits, insurance notice periods and the evidence required for a claim.
Do not schedule installation crews solely from an estimated vessel arrival. Track the shipment, customs release, terminal availability and final-mile appointment, then confirm site readiness before dispatch. A short coordination checklist can prevent labor, crane and storage charges from accumulating at the destination.
Send a Quote-Ready Inquiry to Xutuo House
Ask Xutuo for order-specific packing and delivery data while the US project team confirms local approvals, site work and licensed-trade responsibilities.
Review the relevant Xutuo service and delivery page and send the country, intended use, quantity, destination, target date and required configuration to Xutuo House for a project-specific response.
Sources and Verification Scope