A fact-bounded guide to Xutuo House model XT-EH008, covering water supply, drainage, waterproofing, kitchen and bathroom coordination, wet-area electrical work, commissioning and inspection records.
| Publishing field | Recommended value |
| Suggested slug | /expandable-container-house-kitchen-bathroom-systems-checklist/ |
| Meta title | Expandable House Kitchen & Bathroom Systems Guide |
| Meta description | Review Xutuo expandable house plumbing, drainage, waterproofing, kitchen, bathroom, wet-area electrical and inspection points before ordering. |
| Primary keyword | expandable container house with kitchen and bathroom manufacturer |
| Secondary keywords | expandable container house plumbing system; prefab house kitchen and bathroom; container house waterproofing checklist; expandable house electrical checklist; XT-EH008 |
| Search intent | Informational + commercial investigation |
| Recommended internal link | https://xutuohouse.com/product/expandable-container-house-with-kitchen-and-bathroom/ |
| Source review | Current Xutuo website checked 31 July 2026; client workbook and project plan used for search-intent and claim-boundary review |
Publishing note: use the article title as the page H1. Engineering values must match the final quotation, approved drawings, bill of materials, inspection and test plan, local regulations and utility requirements.
| Quick answer
Buyers searching for an expandable container house with kitchen and bathroom manufacturer should distinguish a factory-prefabricated utility system from a fully commissioned local installation. Xutuo House publishes model XT-EH008 with built-in electricity and plumbing systems, pre-built electricity and water plumbing, bathroom fittings, and an integrated waterproof wall board design. The public page does not state pipe sizes, waterproofing build-up, test pressures, electrical ratings or code approvals. Those details must be confirmed in the order-specific drawings and technical schedule. |
Current product page: View the Xutuo House XT-EH008 kitchen-and-bathroom expandable house
1. What Xutuo House Publishes for XT-EH008
Hebei Xutuo New Material Technology Co., Ltd. identifies itself on its website as a container-house manufacturer in China. Its product range includes expandable container houses, and the directly relevant kitchen-and-bathroom product is model XT-EH008. The model page describes a self-contained structure for individual use or lateral combination, primarily offered in 20ft and 40ft classes with customization.
| Item | Official page states | Evidence boundary |
| Model | XT-EH008 | Manufacturer-published fact |
| Product concept | Expandable house with kitchen and bathroom | Manufacturer-published product title |
| Size classes | Primarily 20ft and 40ft; customization available | Manufacturer-published; final size is order-specific |
| Utility systems | Built-in electricity and plumbing systems | Published system-level statement; components and ratings not listed |
| Factory preparation | Pre-built electricity and water plumbing | Published; site connections still require qualified technicians |
| Wet-area items | Bathroom fittings | Published without a complete fixture schedule |
| Wall treatment | Integrated waterproof wall board design | Published; not a complete waterproofing specification |
| Connection method | Bolt connections | Published assembly description |
| Published uses | House, office, dormitory, shop, bar, emergency room and disaster-relief room | General applications listed on the model page |
Source: Xutuo House XT-EH008 product page, reviewed 31 July 2026.
| Important evidence boundary
“Integrated waterproof wall board” confirms a published wall-board feature. It does not, by itself, confirm the floor waterproofing system, joint treatment, shower upstands, penetrations, drainage falls, flood-test procedure or compliance with a destination-market standard. Request those details separately. |
2. Why Kitchen and Bathroom Systems Must Be Coordinated
In an expandable house, the kitchen and bathroom are not isolated accessory packages. Their layouts affect structural openings, wall and floor penetrations, folding or expansion zones, appliance loads, ventilation, service access and site utility entries. A change to a sink, shower, water heater or cooking appliance can alter several drawings at once. The safest procurement sequence is to freeze the room layout and equipment schedule before production, then coordinate plumbing, waterproofing and electrical plans.
Xutuo’s service page says customization is confirmed again before production and that electrical and plumbing layout plans can be provided. Buyers should use that approval stage to resolve interfaces, not rely only on catalogue photos or a general product name.
| Decision | Why it affects other systems | Document to approve |
| Kitchen and bathroom positions | Sets wet-wall routes, penetrations and access | Dimensioned floor plan |
| Fixtures and appliances | Changes water, waste, power and ventilation demand | Fixture/appliance schedule |
| Water heater type and location | Affects piping, electrical or fuel supply and clearances | Equipment data sheet and services plan |
| Utility entry/exit points | Must align with foundation and local connections | External connection drawing |
| Destination standards | Controls permitted materials, protection and testing | Project technical specification |
3. Water-Supply Checklist
The public XT-EH008 page confirms plumbing is built in, but it does not publish the pipe material, nominal sizes, connection standard, design pressure or hot-water arrangement. An order should therefore include a plumbing drawing and bill of materials that identify the complete route from the external inlet to each fixture.
- Confirm the cold-water inlet location, connection type, orientation and access after the unit is expanded.
- Identify every cold- and hot-water fixture: kitchen sink, wash basin, shower, toilet cistern, water heater, washing-machine point or other selected equipment.
- State the pipe material, size, jointing method, insulation requirement and any protection needed where pipes pass through panels or the floor.
- Confirm isolation valves for the whole unit and for equipment that may require maintenance; valve locations must remain accessible.
- Define the water-heating scope: equipment supplied or by others, energy source, capacity, mounting, relief discharge and required electrical or fuel connection.
- Coordinate freeze protection, heat tracing or draining provisions when the destination climate requires them.
- Require identification of concealed joints and access panels before walls or service covers are closed.
- Put the approved pressure/leak-test method, acceptance criteria and record format in the inspection and test plan rather than assuming a universal test value.
4. Drainage and Venting Checklist
Drainage depends on gravity, so route, fall, support and the final site level are critical. The website does not publish waste-pipe diameters, slopes, trap arrangements or venting. These are project-specific engineering items and must be checked against local plumbing rules and the selected sanitary fixtures.
- Show the discharge point for every sink, basin, shower, floor drain, toilet and appliance on the plumbing drawing.
- Confirm pipe sizes, gradients, fitting types, supports and cleanout or rodding access in the approved specification.
- Verify trap and venting arrangements so water seals are protected and odours do not enter occupied spaces.
- Check that drain routes do not clash with structural members, expandable joints, lifting features or electrical enclosures.
- Confirm the external sewer or wastewater interface, including elevation, connection responsibility and any pump or treatment system supplied by others.
- Inspect penetrations and sleeves before closure; seal interfaces using the approved system without restricting required movement.
- Specify a functional drainage test and evidence format in the project inspection plan, including how visible leaks and standing water will be assessed.
5. Waterproofing Checklist for Wet Areas
Xutuo publishes an integrated waterproof wall board design for XT-EH008. A complete wet-area review must go further. Waterproof performance depends on the interfaces between walls, floors, corners, door thresholds, drains, pipe penetrations, fixtures and sealants. Buyers should request a system detail rather than approve isolated material names.
| Area | Check before production | Inspect before handover |
| Wall surfaces | Board type, joints, corner treatment and wet-zone extent | No damage, open joints or unsealed penetrations |
| Floor | Substrate, waterproof layer if specified, falls and finished surface | Drainage to outlet; no unintended ponding under agreed test |
| Wall–floor junction | Compatible corner/upstand detail | Continuous treatment with no gaps |
| Shower zone | Screen/curtain, splash area, mixer and outlet details | Seals complete; water directed to drain |
| Floor drain | Flange/interface and removable grate | Secure, accessible and correctly connected |
| Pipe penetrations | Sleeve and sealing method | No visible gap, damage or movement conflict |
| Door threshold | Level transition and water-containment detail | Safe access and agreed wet-area containment |
Do not assign a membrane type, thickness, upstand height or flood-test duration unless it is documented for the specific order. Those values vary by construction system, destination rules and client specification. If a flood or spray test is required, define the test area, duration, water level or spray method, acceptance criteria and reporting responsibility in the approved inspection and test plan.
6. Kitchen System Checklist
The XT-EH008 product title refers to a kitchen and bathroom, but the public page does not provide a complete kitchen schedule. “Kitchen” should therefore be converted into an itemized scope before quotation approval. This prevents assumptions about cabinetry, worktops, sink, tap, cooking equipment, refrigerator space, extraction or appliances.
- Approve a dimensioned cabinet and worktop layout, including door swings, drawers and service-access zones.
- List all supplied fixtures and appliances by description, quantity and key interface requirements; identify items supplied by the buyer.
- Coordinate sink water and waste points with cabinet openings so traps, valves and connections remain serviceable.
- Confirm worktop and wall-splashback materials, edge treatment, joints and sealant locations.
- Define cooking-energy type and appliance ratings before electrical or fuel services are designed.
- Confirm mechanical extraction or ventilation requirements and the discharge route allowed by local regulations.
- Show socket/outlet positions in relation to the sink, worktop, appliances and splash zones; apply the destination’s wet-location rules.
- Verify that loose parts, doors, glass, fittings and appliances are protected for transport and listed on the packing document.
7. Bathroom System Checklist
Xutuo’s page states that bathroom fittings are pre-built, but it does not enumerate the fixtures included in every order. The approved fixture schedule should identify the toilet, basin, tapware, shower components, floor drain, mirror, accessories, ventilation equipment and water heater where applicable, together with the supplier for each item.
- Check clearances, door movement and practical access around all selected fixtures.
- Confirm fixture mounting and reinforcement where loads are transferred to wall panels or the floor.
- Coordinate traps, waste outlets, flexible connectors, valves and access panels.
- Specify the shower enclosure or water-control method and its relationship to floor falls and the drain.
- Confirm ventilation provision, outlet route and controls; do not assume a fan is included unless scheduled.
- Define water-heater mounting, pressure/temperature controls, discharge routing and maintenance access where relevant.
- Inspect sealant continuity at basins, shower fittings, wall junctions and penetrations, using only materials compatible with the specified surfaces.
- Check that transport restraints are removed and all fixtures are re-inspected after unfolding and final positioning.
8. Wet-Area Electrical Checklist
A factory-prefabricated electrical system still has to match the destination supply, selected appliances and local safety rules. The XT-EH008 page does not publish voltage, frequency, earthing arrangement, conductor sizes, protective-device ratings or outlet types. These must be confirmed before production by the project’s qualified electrical party.
| Control point | Required order-specific confirmation | Inspection evidence |
| Incoming supply | Voltage, frequency, phases, capacity and connection point | Approved single-line diagram and labels |
| Distribution board | Location, circuit schedule, main isolation and protective devices | Installed board matches approved schedule |
| Kitchen circuits | Loads and dedicated circuits for selected appliances | Circuit identification and functional checks |
| Bathroom/wet zones | Permitted equipment zones, outlet locations and suitable protection | Location check against approved drawing |
| Earthing/bonding | System and required connections under local rules | Test results by qualified technician |
| Cables and containment | Type, size, route, support and penetration protection | Visual inspection before closure |
| Final verification | Continuity, insulation, polarity, protective-device and functional tests as applicable | Signed local commissioning record |
| Site connection requirement
Xutuo’s service page states that all electrical and piping connections must be installed by certified technicians. Factory prefabrication reduces site work, but it does not remove the need for local connection, verification, commissioning or approval. |
9. Inspection and Test Checklist
Xutuo states that its general QC process includes material inspection, production-process inspection and package inspection before shipping. That is useful process information, but the service page does not publish a model-specific test plan for XT-EH008. Buyers who need traceable plumbing, waterproofing or electrical evidence should make the required hold points, tests and records part of the purchase documents.
Recommended inspection sequence
- Document review: approve the floor plan, plumbing drawing, electrical drawing, fixture and appliance schedule, bill of materials, waterproofing details and responsibility matrix.
- Incoming-material review: check selected products against the approved bill of materials and record any agreed certificates, data sheets or batch information.
- Rough-in inspection: verify concealed water, waste and electrical routes, supports, penetrations, protection and access before panels or covers are closed.
- System tests: perform only the pressure, leak, drainage, waterproofing and electrical tests defined in the approved inspection and test plan, using calibrated equipment where required.
- Functional inspection: operate taps, drainage points, fixtures, lights, switches, outlets, ventilation and selected appliances under the agreed test conditions.
- Pre-shipment inspection: review finishes, seals, labels, loose components, transport restraints, packing protection and the completeness of the document package.
- Post-installation commissioning: after unloading, expansion and site connection, recheck systems for transport or installation damage and obtain local technician sign-off.
Minimum record package to request
- Approved-for-production floor plan and coordinated electrical/plumbing layouts.
- Final bill of materials plus fixture, appliance and optional-item schedules.
- Inspection and test plan showing witness points, test methods, acceptance criteria and responsible parties.
- Dated inspection records and photographs for concealed work and specified tests.
- Packing list identifying loose fixtures, fittings, tools, spare parts and documents.
- Installation, operation and maintenance instructions for supplied equipment.
- As-built changes and commissioning records signed by the responsible qualified technicians.
10. Factory Work Versus Destination-Site Work
Xutuo’s service page says electrical and plumbing layouts can be provided and the systems are prefabricated in the factory. The same page also says a crane is needed to lift the product from the truck and all electrical and piping connections must be installed by certified technicians. A clear responsibility matrix should therefore accompany the order.
| Work package | Typical procurement allocation | Must be confirmed |
| Factory-prefabricated internal services | Manufacturer according to approved order | Exact inclusions, materials, routing and factory tests |
| Transport protection | Manufacturer/freight parties as contracted | Restraints, packing, loose-part inventory and moisture protection |
| Crane unloading and positioning | Buyer/site contractor unless contracted otherwise | Crane capacity, access, lifting plan and ground conditions |
| Foundation and external utilities | Buyer/site contractor unless included | Levels, connection points, drainage and local permits |
| Final electrical and piping connections | Certified local technicians | Licensing, testing, commissioning and approvals |
| Post-installation seal and leak review | Defined in contract responsibility matrix | Who repairs, retests and records defects |
11. Suitable Applications and Project Limits
The official XT-EH008 page lists houses, offices, dormitories, shops, bars, emergency rooms and disaster-relief rooms among general uses. Kitchen and bathroom systems make the format relevant where an independent wet-service core is needed, but suitability depends on local planning, structural, fire, accessibility, sanitation, electrical and utility requirements. A website use case is not the same as project approval.
For permanent housing, worker accommodation, hospitality, education, healthcare-related or public-use projects, the buyer should engage local professionals early. Occupancy, climate, water quality, wastewater disposal, accessibility and maintenance capability may materially change the specification.
12. RFQ Checklist for an Expandable Container House with Kitchen and Bathroom Manufacturer
A precise RFQ allows Xutuo House to quote the intended system instead of a generic unit. Send the information below and request that every included, optional and excluded item be identified in the quotation.
- Destination country, project location, intended use, number of units and required size class.
- Dimensioned room layout and required kitchen/bathroom arrangement.
- Water supply conditions, sewer or wastewater connection, climate and freeze-risk information.
- Fixture, cabinetry, appliance, water-heater and ventilation requirements.
- Destination electrical supply and required outlet, switch and protective-device standards.
- Required waterproofing details, wet-area finishes and inspection/testing standard.
- Local code, certification, permit and documentation requirements specified by the buyer’s professional team.
- Factory inspection, third-party inspection, witness points, photographs and test reports required before shipment.
- Packing, transport, crane, installation, site connection and commissioning responsibilities.
- Final drawings, manuals, spare parts, warranty terms and defect-resolution procedure.
Frequently Asked Questions
Does Xutuo House publish an expandable model with kitchen and bathroom systems?
Yes. Xutuo lists model XT-EH008 as a light-steel-roof expandable container house with kitchen and bathroom. Its page states built-in electricity and plumbing, pre-built electricity and water plumbing, bathroom fittings and an integrated waterproof wall board design.
Are all kitchen and bathroom fixtures included as standard?
The public XT-EH008 page mentions bathroom fittings but does not publish a complete fixture or kitchen schedule. Treat cabinets, sink, tapware, toilet, shower, water heater, appliances, ventilation and accessories as items to confirm in the quotation.
Does the website provide pipe sizes or a pressure-test value?
No model-specific pipe sizes, materials, pressure values or test durations are published on the reviewed page. Request them in the plumbing drawing, bill of materials and approved inspection and test plan.
Does integrated waterproof wall board mean the whole bathroom is certified waterproof?
No such conclusion should be drawn from that phrase alone. Confirm floor and wall systems, joints, drains, penetrations, test method and destination compliance separately.
Who makes the final utility connections?
Xutuo’s service page says all electrical and piping connections must be installed by certified technicians. The buyer should also confirm local licensing, inspection and commissioning requirements.
What electrical information must be provided before production?
Confirm supply voltage, frequency, phase, capacity, earthing, outlets, circuit loads, protective devices, equipment ratings and applicable local rules. The public XT-EH008 page does not publish these project-specific values.
What inspections does Xutuo publicly describe?
Its service page describes general quality control from material inspection through production-process inspection and package inspection before shipping. Model-specific plumbing, waterproofing and electrical tests should be added to the contract if required.
Why request an expandable container house with kitchen and bathroom manufacturer instead of only a reseller?
The useful distinction is not the label alone but whether the supplier can coordinate approved layouts, factory-prefabricated services, documented materials, inspection hold points and after-shipment technical support. Verify those capabilities and records for the exact order.
About Xutuo House
Xutuo House is the overseas brand of Hebei Xutuo New Material Technology Co., Ltd., which presents itself as a China container-house manufacturer. The company’s official website lists expandable, folding and other prefabricated house categories. For projects requiring kitchen and bathroom systems, XT-EH008 is the directly relevant published model; the final configuration remains subject to quotation, drawings and contract documents.
| Request a coordinated technical quotation
Send Xutuo House the destination, layout, fixture and appliance schedule, utility conditions, electrical standard, waterproofing requirements and required inspection records. Ask for a marked quotation that identifies included, optional, excluded and site-supplied work. |
| Contact channel | Official website information |
| sales@xutuohouse.com | |
| WhatsApp / Mobile | +86 193 0334 8666 |
| Location | Hengshui, Hebei Province, China |
Learn more: XT-EH008 kitchen-and-bathroom product page | Xutuo House homepage | Product directory | Service and installation information
Sources and Verification Note
XT-EH008 official product page — reviewed 31 July 2026.
Xutuo House service page — reviewed 31 July 2026.
Xutuo House official homepage — reviewed 31 July 2026.
Xutuo House product directory — reviewed 31 July 2026.
This article separates manufacturer-published statements from recommended buyer checks. Checklist items are not claims that every XT-EH008 order includes a particular component, test or approval. Before publication or purchase, reconcile the article with the latest quotation, approved drawings, bill of materials, inspection records, contract and local requirements.
| Publisher verification note
The client knowledge-base workbook reviewed on 31 July 2026 contains example-reference content, while its dedicated “填写内容” fields do not provide completed model-specific values. The client project plan identifies kitchen, bathroom and utility preinstallation as a priority content direction, but plan-level material and testing examples are not treated here as XT-EH008 specifications. Product statements in this article are therefore limited to the current official Xutuo pages; all other technical items are presented as buyer checks or order-specific confirmations. |